Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2429.2
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Dec 14, 2023     38-3 Beringer Brake System Re-Routing - (4 hours) Category: Brake System
Completed new rerouting of Beringer Brake lines. Shortened two lines for the new routing. Final install of the Brake Fluid reservoir and steel Tee. Final torqued the braided line fitting. Two different information, first one in document mm-00-005_-_tightening_torque_2.pdf indicating to torque up to 0-1 thread visible. The Beringer RV10 installation manual indicates a different procedure for braided fitting torque (90-132 lbs/in, 10-15 N/m)
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.